63
• Jreurravo”, out vd tavo nedas duala has alaiyojull.TS
Jodu to engitibro Larene To @ eauxD Yabrü
odin and loqu Janių bm, al irodam IIa ‚VI .ol
end mei: „JuozaiteVod exit to Wreyory and amideu
nogu TudowiJnoÛ Bij mort rovo nedod 81er extor
.steiquos od awiirt ain
to noitely.00 end ni bari, or an beau erow yeaT
biva an som lad helmeqrer edm ahow at
.I bond yd
sie od beoolų b37 aine and yu beaubung awe ant
.Jmooon Lnit and ni tibeto '#ToJOBʻLINOU
.elnicaìube Jon ni zinlo 'troJuznou ent
*advold #retauled Holi .US
tu bas ateių obetajoulad out to slow ant
-0% пÕBU @vai mend of bedsenos aœJupina
.ejie und no beïeneu-
BATOF B to elev bra sviðiða up ent
-:e1 bejusOTO
UY.OG: CH.1 2.811.9.7 (ariq ni a .oll beloning atiner
Io. YEE
du. I ".'SDI
.5.1
OS. VOO
01.00
OP.A
do.a
JNI oli
{
•
ΔΙ
00.0EL
100.er
20.0008
JI Moo ni Jes
(arsiq mi d .oll beduruq es incr
Jneués ni jea
todito? wound erstä Bɔboîù avoue no atejeu Isa dzi "OI.'S
szil *0.'E .ob
oJJib
(beroatob ni wodal bus OJİMT)
dzin "0.'¿ ‚ob
-:awollot ak tomonda Lanit shit mi aulav art torbed
03.8602 08.I GI.-US 08. I
JMII .0.1 મા
.0.1
03. [
06.8
04.10
CAS ...
ΤΙ
.0.1
do.4182
.IS.VƏTX..
allow ni ở .0" bedorwg stilurð
d
ILui MLMT07 wodal „ó OJİMTð -roq)aul bedbring Brejerled (ni boruned refų to noid- (.ob) do bertonwy .033 it
TØJUNIJNOƆ of sub troLA
The following additional items of claim were put
forward by the Contractor at an interview
dated 15th. March, 1914.
Item 29. Pointing all dado tiling in Parihan cement in lieu of lime.
2.356 vda. sup. @ 25 conta.
The work was executed as stated, on a verbal variation
order. The extra value is 860.00
Amount due to Contractor............... .860.00
30. Increased rates are asked for Plumber's work as under:
Rate claimed
Rate allowed. 1" lead pipe fixing only 0.75 per yd.run in lieu of
2"
.75
21"
34"
.90
1.10
2 wiped joints
@ .50 each
.75
1.00
#
42
"
The pipes were in very short lengths with a large proportion of bends and joints which involved considerable extra labour. The rates awarded are:-
1* pipes including wiped joints.
.22
.18
.19
.21
.08
.19
.21
32 yds. run @ .75
Allowed in final account
24.00
7.04
Due to Contractor..
.$16.96
2 Pipes (no wiped joints)
10 yds. run @ .60
Allowed in final account
6.00
1.80
Due to Contractor
4.20
2+* Pipes
3 yds. run @ .68
Allowed in final account
- 2.04
.57
Due to Contractor.
1.47